
State officials have closed off an area to drill wells and route large carrier pipes beneath the street. The closed-loop system will keep a liquid solution flowing between the well field and the Capitol to absorb and shed the building’s heat.
Capitol Administrator Robert Ripley says the ground’s temperature will cool the solution within the pipes. He says the building’s heat will return as cool air after traveling into the ground.
Construction is expected to be completed within a year.